Continued Gold Mineralisation in Drill Reults at Indochine Mining's Mt Kare Gold/Silver Project, PNG
Sydney, Feb 18, 2013 AEST (ABN Newswire) - Indochine Mining Limited (ASX:IDC) are pleased to provide a drilling update on results from a further 8 holes from the 2012 drill programme.
2012 Drill Programme Results
Best recently received results from a further 8 holes from the 2012 drill programme include:
Drillhole 169SD12
17 metres (m) at 5.2 grams/tonne (g/t) gold, 30 g/t silver from 27m downhole, including
7 m at 10.6 g/t gold, 62 g/t silver from 36 m down hole, within the WRZ Zone.
Drillhole 161SD12
6 m at 5.5 g/t gold, 95 g/t silver from 6 m downhole within the BZ Zone.
Drillhole 158SD12
97 metres at 1.5 g/t gold from 31.7m downhole, including
4 m at 6.7 g/t gold, 30 g/t silver from 51 m down hole, and
3 m at 5.9 g/t gold, 48 g/t silver from 79 m downhole within the WRZ Zone.
Drillhole 157SD12
76 metres at 1.5 g/t gold from 26m downhole within the CZ Zone.
Encouraging wide intercepts of gold mineralisation in the Central Zone (CZ) reinforce potential for mineralised extensions.
Final drill results from 2012 drilling (4 holes) are expected to be released later in February.
Bonanza Zone Drill Programme
Six drillholes were completed in a bonanza gold zone in the BZ Zone at Mt Kare, with first results due this week after the completion of check assays.
Drilling is currently underway on a separate bonanza gold zone within the WRZ Zone. Four drillholes have been completed.
View the complete Indochine Mining announcement including drill resuls at the link below:
http://media.abnnewswire.net/media/en/docs/ASX-IDC-720751.pdf
Contact
Indochine Mining Limited
T: +61-2-8246-7007
F: +61-2-8246-7005
WWW: www.indochinemining.com
| ||
|