Dragon Energy Ltd Stock Market Press Releases and Company Profile

View in Other Languages 华龙能源有限公司(ASX:DLE)开始皮尔巴拉铁矿项目概略研究 華龍能源有限公司(ASX:DLE)開始皮爾巴拉鐵礦項目概略研究 Dragon Energy Limited (ASX:DLE) Commence Scoping Study for Pilbara Iron Project 
Dragon Energy Limited (ASX:DLE) Commence Scoping Study for Pilbara Iron Project
Dragon Energy Limited (ASX:DLE) Commence Scoping Study for Pilbara Iron Project

Perth, Aug 17, 2011 AEST (ABN Newswire) - As reported in the June Quarterly Report, Dragon Energy Limited (googlechartASX:DLE) made an in principle decision to pursue rapid development of its Pilbara Iron Project (the "Project"). To progress this initiative, Dragon is pleased to announce the appointment of GHD Pty Ltd ("GHD") as lead consultant for the scoping study of the Project. This study is expected to be completed in late September and will examine Dragon's options for developing the Project. The scoping study will take into consideration Dragon's objectives, specifically:

- Early development with emphasis on speed to market; and

- Maximise self-determination for transportation infrastructure.

Dragon selected GHD after reviewing proposals from five competing consulting groups. Commenting on this appointment, Dragon's Managing Director, Mr Gang Xu said: "Dragon is very pleased to engage the services of GHD, a highly reputable engineering group, to conduct the scoping study on our flagship Pilbara Iron Project."

About the Pilbara Iron Project

Dragon's Pilbara Iron Project consists of two advanced iron ore exploration projects (Rocklea and Nameless) located in Central Pilbara.

The projects are in close vicinity to Rio Tinto's (googlechartASX:RIO) Tom Price and Paraburdoo mines.

Both Rocklea and Nameless host channel iron style mineralisation, which is typically found and mined in Western Pilbara. Drilling by the previous owner defined the iron ore mineralisation on both projects.

At Rocklea, the current JORC inferred Resource is 63.1Mt @ 53.4% Fe (60.4% caFe). At Nameless, Dragon defined an exploration target of 140-190Mt @ 48-52% Fe (54-56% caFe). Dragon is about to launch its own drilling programmes aiming to increase the confidence level of the Resource at Rocklea, and to delineate a maiden resource at Nameless.

The Project is located within major public and private transportation infrastructure corridors. As part of the scoping study, Dragon will determine the most suitable transportation solution consistent with its stated objectives.

About GHD

GHD is one of the world's leading engineering, architecture and environmental consulting companies. Established in 1928, GHD employs more than 6,000 people across five continents and serves clients in the global markets of energy and resources, water, environment, property and buildings, and transportation.

Wholly-owned by its people, GHD is focused on client success. GHD's global network of engineers, architects, planners, scientists, project managers and economists collaborate to deliver sustainable outcomes for its clients and the community.

For the complete Dragon Energy Limited announcement including figures and tables, please refer to the following link:
http://media.abnnewswire.net/media/en/docs/69019-ASX-DLE-553484.pdf

Contact

Gang Xu
Managing Director
Tel: +61-8-9322-6009
Mob: +61-411-039-645
http://www.dragonenergyltd.com/



ABN Newswire
ABN Newswire This Page Viewed:  (Last 7 Days: 12) (Last 30 Days: 94) (Since Published: 10762) 

View in Other Languages 134111197210762 (36145)

googlechart