
ABN Newswire Stocks to Watch: March 30, 2010
Sydney, Mar 31, 2010 AEST (ABN Newswire) - Murchison Metals Limited (
ASX:MMX) (
PINK:MUMTF) said that Oakajee Port & Rail ("OPR") has completed and delivered to the Western Australian Government a draft Bankable Feasibility Study (BFS) for the mid-west Oakajee port and rail infrastructure project (the Oakajee Project). As a result of the planned initial capacity increasing by almost 30%, OPR has revised the capital cost estimate for the full port and rail project to A$4.37 billion, including a contingency of A$403 million.
Burleson Energy Limited (
ASX:BUR) said that the Wilcox drilling campaign is due to commence with the spudding of the Heintschel 1 well. The drilling rig is expected to arrive on the Heintschel 1 site in early April 2010.
Texon Petroleum Limited (
ASX:TXN) advises that its first Mosman-Rockingham well has encountered 200ft of oil and gas shows in the Eagle Ford reservoir and in the underlying Buda Limestone at a depth of 3,404 metres. This is in addition to the oil and gas shows from the Olmos reservoir referenced in the Company's release dated 26 March 2010.
Adelaide Energy Limited (
ASX:ADE) (
PINK:ADEZF) said its 100% owned Hollick-1 well has intersected a significant gas show of 2000 units against a background of 22 units at 2672metres Measured Depth (MD) in the Jacaranda Ridge Sandstone primary objective.
Contact
Michelle Liang
Asia Business News Asia Bureau
Tel: +61-2-9247-4344
Email: michelle.liang@abnnewswire.net
| ||
|