Beach Petroleum Limited (ASX:BPT) Weekly Drilling Report Week ending 12 August 2009
Perth, Aug 14, 2009 AEST (ABN Newswire) - Beach Petroleum Limited (ASX:BPT)(PINK:BEPTF) drilling report for the week ending 12 August, 2009. Highlights of the week's activities include:
Beach Petroleum Operated Cooper / Eromanga Exploration (PEL 91)
Chiton-1 is drilling ahead at a depth of 887 metres in the Allaru Mudstone. It is expected that the well will enter the primary reservoir objective Namur Sandstone within the next 24-48 hours. Participants in Chiton-1 are Beach Petroleum Ltd, 40% and Drillsearch Energy Ltd, 60%.
Browse Basin, Offshore Western Australia - Burnside 1ST1 Gas Exploration Well
Burnside-1ST1 (Beach 7.34%) is being plugged and abandoned as planned. The well encountered low permeability sandstone in the primary reservoir objective Brewster Sandstone which is interpreted to be gas-saturated. The implications of the result are still being assessed by the Joint Venture.
Basker - Manta - Gummy (BMG) Oil Field Development - Gippsland Basin
Basker-7 (Beach 30%) has reached total depth of 3921 metres. Analysis of petrophysical data is being undertaken in order to finalise the forward program for the well.
---------------------------------Well Participants---------------------------------Chiton-1 BPT* 40.00% PEL 91 DLS 60.00% Oil ExplorationC/E Basin, SA-------------------------------------------------------Weekly Progress & Summary Primary Targets-------------------------------------------------------Report Time: 0800 (CST) 12/08/2009 Namur SandstoneDepth: 887m Birkhead FormationOperation: Drilling ahead in Poolowanna Fm (s) the Allaru Mudstone.Progress: 231m Hutton Sandstone (s)---------------------------------Well Participants---------------------------------Paralana-2 BPT* 21.00% GEL 178 PTR 69.00% Geothermal Expln TRU 10.00%Arrowie Basin, SA -------------------------------------------------------Weekly Progress & Summary Primary Targets-------------------------------------------------------Report Time: 0600 hrs (CST)12/08/2009 Upper CannanaDepth: 1427m or Bolla BollanaOperation: Drilling ahead in the Erudina Formation.Progress: 311m ---------------------------------Well Participants---------------------------------Burnside-1ST1 BPT 7.34% WA 281P (offshore) STO* 47.83% Gas Exploration IBL 20.00% Browse Basin, WA CVX 24.83% -------------------------------------------------------Weekly Progress & Summary Primary Targets-------------------------------------------------------Report Time: 0500 hrs (WST)12/08/2009 Lower CretaceousDepth: 4182m (TD)Operation: Well is being plugged and abandonded.Progress: 0m---------------------------------Well Participants---------------------------------Basker-7 BPT 30.00% Vic L26 ROC* 30.00% Oil Development CIE 20.00% Gippsland Basin, SJE 10.00% VIC PTM 10.00%-------------------------------------------------------Weekly Progress & Summary Primary Targets-------------------------------------------------------Report Time: 600 hrs (AEST)12/08/2009 Latrobe GroupDepth: 3921m (TD)Operation: Pulling out of hole with MDT pressure tools.Progress: 384m---------------------------------Well Participants---------------------------------Charo-5 BPT 20.21% PPL 177 STO* 66.60% Oil Appraisal ORG 13.19% C/E Basin, SA -------------------------------------------------------Weekly Progress & Summary Primary Targets------------------------------------------------------- Report Time: 0600 hrs (CST)12/08/2009 Birkhead FormationDepth: 1870m (TD) Hutton SandstoneOperation: Pulling out of hole Namur Sandstone prior to running wireline logsProgress: 1870m---------------------------------Well Participants---------------------------------Wackett-14 BPT 23.20% PL 62 STO* 60.06% Gas Development ORG 16.74%C/E Basin, QLD-------------------------------------------------------Weekly Progress & Summary Primary Targets-------------------------------------------------------Report Time: 0600 hrs (CST)12/08/2009 Toolachee Formation Depth: 1650m Operation: Drilling ahead in the Westbourne Formation.Progress: 1650m* Operator(s) Secondary TargetsBPT Beach Petroleum LtdPTR Petratherm LtdCIE Cieco Exl & Prod COE Cooper EnergySTO Santos LimitedROC Roc Oil CVX Chevron Australia Pty LtdTRU TRUenergy Pty LtdSJE Sojitz Energy ORG Origin Energy Resources LtdIBL INPEX Browse, Ltd.PTM Pertamina