Bandanna Energy Limited Stock Market Press Releases and Company Profile

View in Other Languages Bandanna Energy Limited (ASX:BND)发布南加利利煤矿项目环境影响评估报告 Bandanna Energy Limited (ASX:BND) Release of EIS for the South Galilee Coal Project Bandanna Energy Limited (ASX:BND)發布南加利利煤礦項目環境影響評估報告 
Release of EIS for the South Galilee Coal Project
Release of EIS for the South Galilee Coal Project

Brisbane, Oct 17, 2012 AEST (ABN Newswire) - Bandanna Energy Limited (googlechartASX:BND) today announced that the Queensland Government has approved the release for public review of the Environmental Impact Statement (EIS) for the South Galilee Coal Project.

The South Galilee Coal Project (SGCP) covers EPC 1048, EPC 1049, EPC 1179 and EPC 1180. In May 2011 MLA 70453 covering the northern portion of EPC 1049 was lodged, coincident with an area the subject of a February 2011 Resource Statement. The SGCP is located at Alpha, approximately 170 km west of Emerald in Central Queensland.

The SGCP is a joint venture between Bandanna Energy and AMCI (Alpha) Pty Ltd (AMCI), and is managed by a wholly owned subsidiary of AMCI, Alpha Coal Management Pty Ltd. Bandanna Energy holds a 50% interest in the SGCP through its wholly owned subsidiary Alpha Coal Pty Ltd.

The SGCP is proposed to be developed as an open cut and underground mining operation, with an estimated mine life of 33 years. Mine plan development supports an average production rate of 15.2 Mtpa raw coal, yielding an average 13.6 Mtpa of product coal and peaking at 16.6 Mtpa of product coal.

The SGCP joint venture expects that around 1600 people will be required during the two year construction phase of the SGCP, with an operational workforce of 1290 once the mine is in production. The proposed mine includes coal handling infrastructure, a mine water management system, mine access roads, an on-site accommodation village and a rail spur to connect to a common user rail line.

The SGCP EIS will be available for public comment until 5pm Monday 3 December, 2012. The EIS is available to view online at the Department of State Development, Infrastructure and Planning website at www.dsdip.qld.gov.au/sgcp and will be on public display (subject to local opening hours) at Barcaldine Regional Council, 43 Dryden Street, Alpha, Barcaldine Regional Council, 44 Pasteur Street, Jericho, State Library of Queensland, Cultural Centre, Stanley Place, South Bank, Brisbane and the National Library of Australia - Parkes Place, Canberra ACT 2600.

Managing Director Mr Michael Gray welcomed the approval of release of the EIS, noting "that the EIS process is a critically important stage in the SGCP approvals process and in our engagement with key stakeholders in the broader community."

View the full Bandanna Energy announcement at the link below:
http://media.abnnewswire.net/media/en/docs/ASX-BND-700630.pdf


Contact

Bandanna Energy Limited
Michael Gray, CEO
T: +61-7-3041-4400
F: +61-7-3041-4444
E: info@bandannaenergy.com.au
WWW: www.bandannaenergy.com.au



ABN Newswire
ABN Newswire This Page Viewed:  (Last 7 Days: 11) (Last 30 Days: 83) (Since Published: 13981) 

View in Other Languages 164451398112836 (43262)

googlechart