View in Other Languages Australian Market Report of November 10, 2010: Noble Mineral (ASX:NMG) To Raise A$30M For Extensive Gold Drilling Campaign in Ghana 2010年11月10日澳洲股市:Noble Mineral (ASX:NMG)将为加纳大规模金矿钻探项目筹资3000万澳元 2010年11月10日澳洲股市:Noble Mineral (ASX:NMG)將為加納大規模金礦鑽探項目籌資3000萬澳元 オーストラリア市場レポート 2010年11月10日: Noble Mineral (ASX:NMG) はガーナでの広域金掘削取組みに対し3,000万豪ドルを調達予定 2010년 11월10일 호주 시장보고서: Noble Mineral (ASX:NMG), 가나에서의 광범위한 금 시추작업을 위해 3천만 달러(A$) 조성 Laporan Pasar Australia 10 Nopember 2010: Noble Mineral (ASX:NMG) Menambahkan 30 Juta Dollar Australia untuk Pengeboran Besar-besaran di Ghana Australischer Marktbericht vom 10. November 2010: Noble Mineral (ASX:NMG) bringt 30 Millionen A$ für eine extensive Goldbohraktion in Ghana auf Reporte del Mercado Australiano, 10 de noviembre de 2010: Noble Mineral (ASX:NMG) por recaudar AUD$30M para Campaña Extensiva de Perforación en Ghana تقرير السوق الاسترالية ليوم 10 تشرين الثاني/نوفمبر، 2010: تعمل شركة Noble Mineral ASX:NMG على جمع رأس مال يقدر بحوالي 30$A مليون دولار لتمويل برنامج مكثف للتنقيب عن الذهب في غانا 
Australian Market Report of November 10, 2010: Noble Mineral (ASX:NMG) To Raise A$30M For Extensive Gold Drilling Campaign in Ghana
Australian Market Report of November 10, 2010: Noble Mineral (ASX:NMG) To Raise A$30M For Extensive Gold Drilling Campaign in Ghana

Sydney, Nov 10, 2010 AEST (ABN Newswire) - Noble Mineral Resources (googlechartASX:NMG) has received firm commitments for the placement of approximately 77 million shares at 39 cents to raise A$30m. The fund will be used for an extensive drilling campaign that is expected to result in substantial increases in reserve and resource estimates at its Bibiani Gold Project in Ghana. The campaign will drill 55,000m a month for the next 12 months and the results are expected to generate a series of regular reserve and resource upgrades at Bibiani. Resources currently stand at 1.98m ounces, including 605,000oz in Reserves.

Sipa Resources Limited (googlechartASX:SRI) announced that RAB/Aircore drilling has recommenced at its 100% owned Woodline Gold and Basemetals Project, located about 150 kilometres southeast of Kalgoorlie in Western Australia. The 4 week drilling programme will cover approximately 600 holes to infill previous drilling where very encouraging intersections were recently returned. Results from the previous programmes have suggested strongly anomalous gold (of above 50 ppb) in the project area.

Paradigm Metals Limited (googlechartASX:PDM) has commenced a 2000m air core and percussion drill program targeting iron oxide-copper-gold mineralisation at the Toolebuc project in Queensland. Drill holes will initially test several previously undrilled magnetic anomalies to total depths of up to 100m, under shallow sedimentary cover 20-50m thick. Initial assay results are expected by early December 2010.

Gold One International Limited (googlechartASX:GDO) said today that drilling results at its flagship Modder East gold mine in South Africa have confirmed an extension to the high grade shoreline. Borehole DD68 contain 177.1 grams per tonne over a channel thickness of 72 centimetres and borehole DD69 contain 37.3 grams per tonne over 56 centimetres.

Contact

Asia Business News
Tel: +61-2-9247-4344
http://www.abnnewswire.net


ABN Newswire
ABN Newswire This Page Viewed:  (Last 7 Days: 13) (Last 30 Days: 41) (Since Published: 11904) 

View in Other Languages 1190498768449837279427697748572567117 (76098)

googlechart