Beach Energy Limited (ASX:BPT) Weekly Drilling Report Week Ending 3 March 2010
Adelaide, Mar 3, 2010 AEST (ABN Newswire) - Beach Energy Limited (ASX:BPT) (PINK:BEPTF) drilling report for the week ending 3 March, 2010. Highlights of the week's activities include:
Egypt - North Shadwan Concession - Gulf of Suez
The Nafta-1 rig has been released from the NS377-5 oil field development well location. The ESP has been successfully commissioned and the well was pumped to clean up for approximately two hours at a steady rate of 2500 bfpd. The well results increase the confidence that an initial combined rate in excess of 3,000 bopd can be achieved when the NS377-3 and NS377-5 wells are brought on line later this year (Beach 20%).
Arrowie Basin (South Australia) - Paralana-2 Geothermal Well
Temperature measurements have been undertaken at the Paralana-2 geothermal well. The temperature measured at 3,674 metres using a maximum recording thermometer is 1760C, which exceeds the minimum temperature of 1700C targeted for the development of the Paralana resource (Beach earning 21%).
Cooper/Eromanga Basin Exploration and Development
Drilling Operations in the Cooper/Eromanga remain suspended following the heavy rainfalls in the basin. Operations will resume as soon as roads in the basin become accessible.
--------------------------------------Well Participants--------------------------------------NS 377-5 BPT 20.00%Oil Development BP* 50.00%North Shadwan TOE 30.00%Egypt--------------------------------------------------------------Weekly Progress & Summary Primary Targets--------------------------------------------------------------Report Time: 0600 hrs(local)2/03/2010 Kareem FormationDepth: 2909m (TD)Operation: Rig has been released following the successful commissioning of Electric Submersible Pump (ESP).Progress: 0m--------------------------------------Well Participants--------------------------------------Coonatie-16 BPT 17.14%PPL 131 STO* 72.32%Gas Development ORG 10.54%C/E Basin, SA-----------------------------------------------------------Weekly Progress & Summary Primary Targets-----------------------------------------------------------Report Time: 0600 hrs(CST)3/03/2010 multi Permian targetsDepth: 1132mOperation: Waiting on weather.Progress: 0m( * ) Operator(s) Secondary TargetsBPT Beach Energy Ltd (ASX:BPT)ORG Origin Energy Resources Ltd (ASX:ORG)BP BP Exploration (Delta) (LON:BP)TOE TriOcean EnergySTO Santos Limited (ASX:STO)
Contact
Hector Gordon
Chief Executive Officer
TEL: +61-8-8338-2833
FAX: +61-8-8338-2336
www.beachenergy.com.au
| ||
|