Beach Petroleum Limited (ASX:BPT) Weekly Drilling Report Week ending 5 August 2009
Adelaide, Aug 6, 2009 AEST (ABN Newswire) - Beach Petroleum Limited (ASX:BPT)(PINK:BEPTF) announces the drilling report for the week ending 22 July, 2009.
Beach Petroleum Operated Cooper / Eromanga Exploration
Murninnie-1 (PEL 92, Beach 75%), has been plugged and abandoned. The Ensign 30 rig is being moved to the Chiton-1 well location in adjacent Licence PEL 91. Chiton-1 is expected to spud on 8 August. Participants in Chiton-1 are Beach Petroleum Ltd, 40% and Drillsearch Energy Ltd, 60%.
Cooper/Eromanga Oil Exploration and Development - Santos Operated
In areas operated by Santos, Charo-4 (Beach 20.21%) has been plugged and abandoned.
Arrowie Basin (South Australia) - Paralana-2 Geothermal Exploration Well
The Paralana-2 geothermal exploration well (Beach earning 21%) is at a depth of 1116 metres. Casing has been installed to section TD. The current operation is installing blowout preventers prior to drilling ahead.
Browse Basin, Offshore Western Australia - Burnside 1ST1 Gas Exploration Well
Burnside-1ST1 (Beach 7.34%) has reached total depth of 4182 metres. The current operation is continuing an evaluation of the primary reservoir objective.
Basker - Manta - Gummy (BMG) Oil Field Development - Gippsland Basin
Basker-7 (Beach 30%) is drilling ahead at a depth of 3920 metres.
---------------------------------Well Participants---------------------------------Murninnie-1 BPT* 75.00% PEL 92 COE 25.00% Oil ExplorationC/E Basin, SA-------------------------------------------------------Weekly Progress & Summary Primary Targets-------------------------------------------------------Report Time: 0600 (CST) 05/08/2009 Namur SandstoneDepth: 2051m MD (TD) Birkhead FormationOperation: Well has been plugged and abandoned.Progress: 652m-------------------------------------Well Participants--------------------------------------Paralana-2 BPT* 21.00% GEL 178 PTR 69.00% Geothermal Exploration TRU 10.00%Arrowie Basin, SA-------------------------------------------------------Weekly Progress & Summary Primary Targets-------------------------------------------------------Report Time: 0600 hrs (CST)05/08/2009 Upper Cannana Depth: 1116m or Bolla BollanaOperation: Installing blowout preventers prior to drilling ahead.Progress: 47m---------------------------------Well Participants---------------------------------Burnside-1ST1 BPT 7.34% WA 281P(offshore) STO* 47.83% Gas Exploration IBL 20.00% Browse Basin, WA CVX 24.83% -------------------------------------------------------Weekly Progress & Summary Primary Targets-------------------------------------------------------Report Time: 0500 hrs (WST)04/08/2009 Lower CretaceousDepth: 4182m (TD)Operation: Rigging up sidewall core tool.Progress: 333m---------------------------------Well Participants---------------------------------Basker-7 BPT 30.00% Vic L26 ROC* 30.00% Development CIE 20.00% Gippsland Basin, SJE 10.00% VIC PTM 10.00%------------------------------------------------------Weekly Progress & Summary Primary Targets------------------------------------------------------Report Time: 800 hrs (CST) 5/08/2009 Latrobe GroupDepth: 3920mOperation: Drilling ahead.Progress: 1408m---------------------------------Well Participants---------------------------------Charo-4 BPT 20.21% PPL 177 STO* 66.60% Oil Appraisal ORG 13.19% C/E Basin, SA---------------------------------------------------------Weekly Progress & Summary Primary Targets---------------------------------------------------------Report Time: 0600 hrs (CST)05/08/2009 Birkhead FormationDepth: 2136m (TD) Hutton SandstoneOperation: Well has been plugged Namur Sandstone and abandoned.Progress: 316m---------------------------------Well Participants---------------------------------Wackett-15 BPT 23.20% PL 62 STO* 60.06% Gas Development ORG 16.74% C/E Basin, QLD------------------------------------------------------Weekly Progress & Summary Primary Targets------------------------------------------------------Report Time: 0600 hrs (CST)05/08/2009 Toolachee FmDepth: 2002m (TD)Operation: Well has been cased and suspended as a future Toolachee Formation gas producer.Progress: 666m* Operator(s) Secondary TargetsBPT Beach Petroleum LtdIBL INPEX Browse, Ltd.ROC Roc Oil CIE Cieco Exl & ProdORG Origin Energy Resources LtdSJE Sojitz Energy COE Cooper EnergyPTM Pertamina STO Santos Limited CVX Chevron Australia Pty Ltd PTR Petratherm Ltd TRU TRUenergy Pty Ltd