Core Exploration Ltd Stock Market Press Releases and Company Profile

查看其它语言版本 Core Exploration Ltd (ASX:CXO)在BP33钻遇宽阔的高品位锂矿段 Core Exploration Ltd (ASX:CXO)在BP33鑽遇寬闊的高品位鋰礦段 Core Exploration Ltd (ASX:CXO) Wide High-Grade Lithium Drill Intersections at BP33 
在BP33钻遇宽阔的高品位锂矿段
在BP33钻遇宽阔的高品位锂矿段

Adelaide, 2017年11月28日, AEST (ABN Newswire) - Core Exploration Ltd (googlechartASX:CXO) (以下简称"Core" 或 "公司")欣然宣布,上周我们在Core全资拥有的BP33高品位伟晶岩探矿区钻遇较宽的伟晶岩后,现已收到分析结果,证实在BP33有较宽的高品位锂辉石。

要点

- 得到BP33的高品位锂矿钻孔分析结果,包括:

o 钻孔FRC103,从101米处起见矿 54米,氧化锂含量1.42%

o 钻孔FRC104,从66米处见矿46米,氧化锂含量1.51%

- 见矿品位高,其宽度是北领地锂辉石见矿的最宽结果之一

- 结果证实BP33锂辉石伟晶岩沿走向在南北两头开放,并且深处的厚度大于预期

- 目前还在等待钻孔FRC104的下一个25米钻进井段(112米-137米) 以及钻孔FRC105 的分析结果

- 已在BP33立即开始金刚石钻孔的跟进钻探,以便能对BP33做初步资源量估算

- 估计在数周之内可收到BP33的更多钻孔分析结果

- BP33距离Grants 锂矿床仅5公里

- Core公司希望将BP33纳入公司在Finniss锂矿项目的锂矿资源量中。

BP33位于公司新收购的Bynoe锂矿项目中,在达尔文附近,Core的新分析结果显示这是BP33迄今为止钻遇的最宽伟晶岩矿段,也是北领地迄今所钻的最宽的含锂辉石矿段之一。

BP33的新分析结果中有一段54米长见矿,氧化锂含量1.4%,位于锂辉石伟晶岩之中,始于反循环钻孔FRC103中的101米处,令人瞩目。

在BP33的北端,钻孔FRC 104在第66米-112米处钻遇高品位锂辉石,见矿46米,氧化锂含量1.51%。还有25米见矿是钻孔FRC 104 的第112米至137米的井段,尚未得出分析结果。

钻孔FRC 102从73米处起见矿36米,氧化锂含量0.74%,(边界品位0.1%),其中在146米处有一段高品位矿段16米,氧化锂含量1.40%。但我们注意到钻孔FRC102在钻进过程中返回的样品质量差,还发现有污染,据解释这些污染混入并稀释了锂分析。Core计划在这个孔附近重新钻金刚石取芯钻孔,用分析品位来证实地质情况。

对于BP33D 钻探,Core的董事总经理 Stephen Biggins表示:

"Bynoe 锂矿项目的收购,给Core带来了立竿见影的结果。这些高品位锂矿段意义非凡,显示BP33可能具有与Grants相似的潜力。"

由于最近钻探的成功,我们现在计划在BP33实施更多钻探,以确定BP33的完整范围,提高Core在北领地的锂矿资源量。我们也可能测试可能存在于BP33北端附近地区的另一个构造,有可能令BP33的潜在规模大幅扩展。"

请点击以下链接浏览图表:
http://abnnewswire.net/lnk/HNHL89R2


内容关于 Core Exploration Ltd

Core Exploration ASX:CXOCore Exploration Ltd (ASX:CXO) is an emerging lithium producer focused on development of its Finniss Project near Darwin in the Northern Territory. Core owns 100% of Finniss, a major developing project that lies close to existing infrastructure such as the Darwin Port, grid power, gas and rail infrastructure.

The Finniss Project covers a 500km2 tenement holding and 25 historic pegmatite mines. The project area is about 80km from Darwin Port. Exploration work has generated a near term development timeline, with feasibility studies to be completed over the course of 2018 ahead of receipt of approvals in early 2019 and planned first production during 2019.

An aggressive exploration program is under way, which has confirmed the high quality prospectivity across much of the Finniss Project area. Core's stated ambition is to upgrade Finniss' resource base to fast-track commercialisation options.

https://plus.google.com/u/0/b/111182394291430627290/111182394291430627290/about https://twitter.com/CoreExploration https://www.facebook.com/pages/Core-Exploration-Ltd/695217903863102?sk=timeline abnnewswire.com 


联络

Stephen Biggins
董事总经理
Core Exploration Ltd
电话: +61-8-7324-2987
电邮: info@coreexploration.com.au



ABN Newswire
ABN Newswire 本页浏览人次:  (过去7日: 22) (过去30日: 106) (自发布以来: 9739) 

查看其它语言版本 973968976788 (23424)

googlechart