Petratherm Ltd
ASX:PTR ISIN:AU000000PTR5
News
Beach Petroleum Limited (ASX:BPT)(PINK:BEPTF) announces the drilling report for the week ending 22 July, 2009. Murninnie-1 (PEL 92, Beach 75%), has been plugged and abandoned. The Ensign 30 rig is being moved to the Chiton-1 well location in adjacent Licence PEL 91. In areas operated by Santos, Charo-4 (Beach 20.21%) has been plugged and abandoned. Basker-7 (Beach 30%) is drilling ahead at a depth of 3920 metres.
Beach Petroleum Limited (ASX:BPT)(PINK:BEPTF) announces the drilling report for the week ending 22 July, 2009. Murninnie-1 (Beach 75%) spudded on 24 July and is drilling ahead in the Murta Formation at a depth of 1399m. In areas operated by Santos, one well is in progress (Charo-4, Beach 20.21%). The Paralana-2 geothermal exploration well (Beach earning 21%) is drilling ahead at a depth of 1069 metres. Basker-7 (Beach 30%) spudded on 21 July and is drilling ahead at a depth of 2512 metres.
Beach Petroleum Limited (ASX:BPT)(PINK:BEPTF) announces the drilling report for the week ending 22 July, 2009. Highlights of the week's activities include: Willunga-1 (Beach 75%) has been plugged and abandoned after wireline logs confirmed the absence of commercial volumes of hydrocarbons in the well. The Paralana-2 geothermal exploration well (Beach earning 21%) is drilling ahead at a depth of 796 metres.
Beach Petroleum Limited (ASX:BPT)(PINK:BEPTF) drilling report for the week ending 8 July, 2009. The Ensign 30 rig will be moved to the Willunga-1 location, also in PEL 92 and located 15 km north west of the Parsons oil field. The Paralana-2 geothermal exploration well is currently drilling ahead at a depth of 480 metres in the Maree Formation. Burnside-1 has been sidetracked due to mechanical issues. Burnside-1ST1 is drilling ahead at a depth of 2320 metres.
Beach Petroleum Limited (ASX:BPT)(PINK:BEPTF) announces the drilling report for the week ending 1 July, 2009.
Beach Petroleum Limited's (ASX:BPT)(PINK:BEPTF) Butlers-1, the third well of a planned six well oil exploration program in PEL 92 is to be cased and suspended after intersecting a 4.5 metre oil column in high quality reservoir at the top of the Namur Sandstone. Butlers-1 is the second successive oil discovery in the current drilling campaign.
In the face of the current economic downturn, the Australian geothermal industry has experienced significant growth in the number of companies that have joined the search for "Hot-Rock Energy", fuelled by the rapidly increasing demand for renewable energy. In the nine months since the Australian geothermal industry launched the world's first Geothermal Reporting Code, six companies have reported massive geothermal energy reserves.
In the face of the current economic downturn, the Australian geothermal industry has experienced significant growth in the number of companies that have joined the search for "Hot-Rock Energy", fuelled by the rapidly increasing demand for renewable energy. In the nine months since the Australian geothermal industry launched the world's first Geothermal Reporting Code, six companies have reported massive geothermal energy reserves.
In the face of the current economic downturn, the Australian geothermal industry has experienced significant growth in the number of companies that have joined the search for "Hot-Rock Energy", fuelled by the rapidly increasing demand for renewable energy. In the nine months since the Australian geothermal industry launched the world's first Geothermal Reporting Code, six companies have reported massive geothermal energy reserves.
Petratherm Ltd (ASX: PTR) - 2007 Annual General Meeting - Mr Terry Kallis, MD; Petratherm Ltd (ASX: PTR) present the following audio webcast regarding "2007 Annual General Meeting". You may also download this audio webcast to your computer or portable audio player.
260,158 COMPANY PROFILE VIEWS
- This Page Viewed: (Last 7 Days: 66) (Last 30 Days: 325) (Since Published: 41287)