Elevra Lithium Limited Stock Market Press Releases and Company Profile
Strengthening the Authier Development Team
Strengthening the Authier Development Team

Brisbane, Mar 22, 2018 AEST (ABN Newswire) - Sayona Mining Limited (googlechartASX:SYA) (googlechartDMNXF:OTCMKTS) ("Sayona" or the "Company") is pleased to announce the strengthening of the Authier technical team with the appointment of Jarrett Quinn and Jean-Pierre Landry as Authier Process Engineer and Project Director, respectively.

The appointments compliment the Authier development team at a time when the Company is rapidly progressing the Authier Definitive Feasibility Study ("DFS") and engineering design activities for the project development. The Company anticipates completing the DFS in the second quarter of 2018, and progressing to the detailed engineering and procurement phase, targeting the commencement of production in early 2020.

Jarrett Quinn, Process Engineer

Jarrett is a mineral processing engineer and hydro-metallurgist with extensive experience and expertise in the minerals industry, including spodumene processing in Canada. Jarrett has worked on flowsheet development for several hard-rock lithium projects in Quebec. Jarrett's qualifications include Bachelor, Master and Ph.D. degrees from McGill University, and he is a professional engineer in the province of Quebec. Jarrett's experience includes, pilot plant operations, process design, feasibility assessment, start-up and operations.

Jarrett will manage the pilot plant testing program at SGS Lakefield, the process plant design for the definitive feasibility study, and detailed engineering of the Authier lithium process plant.

Jean-Pierre Landry, Authier Project Director

Jean-Pierre Landry is a qualified civil engineer who has been involved in the construction industry for more than thirty years, seventeen of which have been in project management with mining companies. Jean-Pierre has been exposed to numerous aspects of project management including cost estimation, scheduling, value engineering, first nations relationship and construction management. His experience stems from a multitude of industrial projects, commercial, institutional and mining.

Jean-Pierre will be deeply involved in the on-going definitive feasibility study and will manage the project delivery schedule. Based in the Abitibi region, Jean-Pierre will be the local contact person for the Project and his knowledge of the area will be a major asset, especially during the construction phase.


About Elevra Lithium Limited

Elevra LithiumElevra Lithium Limited (ASX:ELV) (NASDAQ:ELVR) is a dual-listed lithium producer and developer, supplying a reliable, secure and sustainable source of this critical mineral at the heart of global electrification.

Headquartered in Brisbane, Australia, Elevra has a globally diversified portfolio of world-class lithium assets across Quebec, North Carolina, Ghana, and Western Australia. Elevra was formed through the merger of Piedmont Lithium and Sayona Mining.

By combining operational excellence with disciplined asset management, we strive to maximise efficiency, drive superior shareholder value, and create lasting benefits for all stakeholders.

https://twitter.com/SayonaMining https://www.linkedin.com/company/sayona-mining-limited/ abnnewswire.com 


Contact

Corey Nolan
Chief Executive Officer
Phone: +61-7-3369-7058
Email: info@sayonamining.com.au
www.sayonamining.com.au



ABN Newswire
ABN Newswire This Page Viewed:  (Last 7 Days: 7) (Last 30 Days: 37) (Since Published: 7252)