
Itabela Drilling Program Completed
Brisbane, April 5, 2016 AEST (ABN Newswire) - Sayona Mining Limited (
ASX:SYA) is pleased to announce completion of the maiden drilling program at the Itabela graphite project in Brazil.
Forty-nine air-core and reverse circulation drill holes totaling 2,440 metres have been completed at the San Manuel and San Ruben prospects. The aim of the program, included:
- Testing the grade, strike and lateral extensions of known mineralisation at San Manuel and San Ruben;
- Testing depth extensions to know mineralisation where the limit of drilling is generally between 10 and 20 metres from surface; and
- Validating assays from historical drilling programs.
Samples are being dispatched for analysis, and the results and analysis are expected to be completed by the end of the month.
About Elevra Lithium Limited
Elevra Lithium Limited (ASX:ELV) (NASDAQ:ELVR) is a dual-listed lithium producer and developer, supplying a reliable, secure and sustainable source of this critical mineral at the heart of global electrification.
Headquartered in Brisbane, Australia, Elevra has a globally diversified portfolio of world-class lithium assets across Quebec, North Carolina, Ghana, and Western Australia. Elevra was formed through the merger of Piedmont Lithium and Sayona Mining.
By combining operational excellence with disciplined asset management, we strive to maximise efficiency, drive superior shareholder value, and create lasting benefits for all stakeholders.
| ||
|