Barton Gold Holdings Limited Stock Market Press Releases and Company Profile
Tunkillia 223 Deposit Mineralisation Extended 300m North
Tunkillia 223 Deposit Mineralisation Extended 300m North

Adelaide, Nov 15, 2023 AEST (ABN Newswire) - Barton Gold Holdings Limited (googlechartASX:BGD) (googlechartBGD3:FRA) (googlechartBGDFF:OTCMKTS) is pleased to announce reverse circulation (RC) drilling assays from the Tunkillia Gold Project (Tunkillia). Results have been received for the 223 North, Northern 223, and Central 223 targets. RC and diamond drilling is ongoing at Area 51 and SE Offset.

Drilling has finished at Area 191 and Southern 223, with assays pending. Key new intersections include:

223 North

TKB131: 10m @ 1.67 g/t Au from 52m
TKB143: 54m @ 0.79 g/t Au from 60m, 20m @ 0.71 g/t Au from 118m

Hole TBK143 had over 100m combined mineralisation grading above 0.4 g/t Au.

Northern 223

TKB158: 7m @ 1.26 g/t Au from 168m
TKB160: 15m @ 1.06 g/t Au from 127m
TKB161: 9m @ 1.23 g/t Au from 176m

Central 223

TKB120: 17m @ 2.29 g/t Au from 105m
TKB125: 9m @ 1.23 g/t Au from 83m
TKB126: 10m @ 1.16 g/t Au from 119m

Central 223 drilling tested the footwall of this ~300m long higher-grade zone.

Commenting on Tunkillia drilling assays, Barton MD Alex Scanlon said:

"We are encouraged to see mineralisation suggesting potential growth of the 223 Deposit to the north. Area 223 North is also interesting, with broad mineralisation complementing prior shallow, higher-grade drilling. "We will start updating the Resource model and expect to share results from southern extensional drilling soon."

Drilling Program Overview

On 26 April 2023 Barton announced an updated JORC Mineral Resource Estimate (MRE) for the 223 Deposit of 1.15Moz Au (38Mt @ 0.94 g/t), adding 189koz Au at a cost of only ~A$12 / ounce (all in). Follow up drilling targeting 223 Deposit extensions and regional targets started early September 2023.

27 RC drill holes totalling 3,834m have been completed at 223 North, with 13 RC drill holes totalling 2,115m at the northern end of the 223 Deposit and 6 RC drill holes totalling 1,120m at Central 223.

*To view tables and figures, please visit:
https://abnnewswire.net/lnk/70C314C6


About Barton Gold Holdings Limited

Barton Gold HoldingsBarton Gold Holdings Limited (ASX:BGD) (FRA:BGD3) (OTCQB:BGDFF) is an ASX listed Australian gold exploration company with a total attributable ~1.1Moz Au JORC (2012) Mineral Resources endowment (28.74Mt @ 1.2 g/t Au), a pipeline of advanced exploration projects and brownfield mines, and 100% ownership of the only regional gold mill in the central Gawler Craton of South Australia.

https://twitter.com/bartongoldbgd https://www.linkedin.com/company/barton-gold/ abnnewswire.com 


Contact

Alexander Scanlon
Managing Director
E: a.scanlon@bartongold.com.au
T: +61 425 226 649

Shannon Coates
Company Secretary
E: cosec@bartongold.com.au
T: +61 8 9322 1587



ABN Newswire
ABN Newswire This Page Viewed:  (Last 7 Days: 6) (Last 30 Days: 41) (Since Published: 3507)