Talon Petroleum Limited
ASX:TPD ISIN:AU000000TPD5
News
Talon Petroleum Limited (ASX:TPD) ("Talon") previously reported in its ASX announcement dated 26 July 2013 and an update dated 31 July 2013 that the 9.625 inch and the 7 inch casings had parted during fraccing operations in the O'Brien Energy Company ("O'Benco") operated Roundhouse Prospect proof of concept well (Bonner 1H).
Talon Petroleum Limited (ASX:TPD) announce the June 2013 Quarterly Report and Appendix 5B, with Production for the quarter
Talon Petroleum Limited (ASX:TPD) previously reported in its ASX announcement dated 26 July 2013 that during fraccing operations in the O'Brien Energy Company ("O'Benco") operated Roundhouse Prospect proof of concept well (Bonner 1H) the 9.625 inch and the 7 inch casings parted, that Boots and Coots well control specialists were onsite and that two contractors were injured.
Talon Petroleum Limited (ASX:TPD) advises that O'Brien Energy Company ("O'Benco"), the operator of the Roundhouse Prospect proof of concept well (Bonner 1H), reported that during fraccing operations on 25 July 2013 the 7 inch and 9.625 inch casings parted in the well.
Talon Petroleum Limited (ASX:TPD) advises that further to its announcements on 28 May and 7 June 2013, the Roundhouse Prospect proof of concept well (Bonner 1H) has reached the proposed total measured depth of 15,260 feet (9,472 feet TVD) on 3 July 2013.
Talon Petroleum Limited (ASX:TPD) advises that as indicated in its announcement on 30 May 2013, the Roundhouse Prospect proof of concept well (Bonner 1H) began operations on 31 May 2013. The well as at 6 June was at 2,750 feet.
Talon Petroleum Limited (ASX:TPD) advises that the first well on the Roundhouse Project is expected to begin by early June. The well will be horizontal with a 5,500 foot lateral targeting the Cotton Valley Limestone. It is expected that the well will take about 25 days to drill after which it is planned to be fracced and tested.
Talon Petroleum Limited (ASX:TPD) announce changes to the board with the retirement and election of the Chairman, and further changes within the board.
Notice is given that the first Annual General Meeting of Talon Petroleum Limited (ASX:TPD) will be held at the offices of Minter Ellison, Lawyers, Level 22, Waterfront Place, 1 Eagle Street, Brisbane, Queensland at 11.00 am (Brisbane time) on Thursday 30 May 2013.
As detailed in Talon Petroleum Limited's (ASX:TPD) latest financial report released on 28 March 2013, the Company has a portfolio of exploration and development assets, including production from the Olmos and Wilcox reservoirs in South Texas, and a growing exploration portfolio in East Texas including projects at Roundhouse, Redfish, Catfish Creek and East Banks.
12,278 COMPANY PROFILE VIEWS
- This Page Viewed: (Last 7 Days: 9) (Last 30 Days: 58) (Since Published: 12278)