Coalspur Mines Limited

ASX:CPL ISIN:AU000000CPL4

Coalspur Mines Limited (ASX:CPL)Coalspur Mines Limited (ASX:CPL) (TSE:CPT) is a coal development company with approximately 55,000 hectares of coal leases located within the Hinton region of Alberta, Canada. Coalspur's flagship project is Vista, which covers approximately 10,000 hectares and provides a large scale, surface mineable, thermal coal development. Vista is located adjacent to CN Rail's main line, which is suitable for the transport of coal to deepwater ports on Canada's west coast. Coalspur has secured a port allocation agreement with Ridley Terminals Inc., which is essential to the logistics supply chain necessary to export coal from Vista to the growing demand from the Asia Pacific countries.

 
 
     

View in Other Languages

News

Coalspur Mines Limited (TSE:CPT) Coalspur substantially Increases Vista South Coal Resources

🕔5/23/2012 9:28:00 AM 2621

Coalspur Mines Limited (ASX:CPL) (TSE:CPT) is pleased to announce it has substantially increased the Vista South Coal Project ("Vista South") Measured and Indicated Coal Resources to 470.5 million tonnes ("Mt") and upgraded the Inferred Coal Resource to 604.5Mt, following a recent drilling program.

Read Full Article

Coalspur Mines Limited (ASX:CPL) Interim Financial Statements and M D and A

🕔5/16/2012 9:48:00 AM 2450

The Board of Directors of Coalspur Mines Limited (ASX:CPL) present their report on the consolidated entity of Coalspur Mines Limited ("Coalspur" or "Company") and the entities it controlled during the three months and nine months ended March 31, 2012 ("Consolidated Entity").

Read Full Article

Coalspur Mines Limited (ASX:CPL) Substantially Increases Its Coal Resources Following Recent Vista Extension Acquisition

🕔5/9/2012 2:27:33 PM 2534

Coalspur Mines Limited (ASX:CPL) (TSE:CPT) is pleased to announce an initial Coal Resource estimate on the recently acquired11 Vista Extension, comprising 173.7 million tonnes ("Mt") in the Measured and Indicated Mineral Resource categories and 969.3Mt in the Inferred Mineral Resource category. This significantly increases the Company's total Measured and Indicated Coal Resource by 15% to 1,322.9Mt and the Inferred Coal Resource by 181% to 1,505.2Mt across the Vista Coal Project ("Vista"), Vista South Coal Project ("Vista South") and Vista Extension.

Read Full Article

Coalspur Mines Limited (ASX:CPL) Submits Vista Phase 1 Regulatory Applications

🕔5/2/2012 10:50:00 AM 2236

Coalspur Mines Limited (ASX:CPL) (TSE:CPT) is pleased to announce that it has filed the regulatory applications for Phase 1 of the Company's flagship Vista Coal Project ("Vista"). These applications include an Environmental Impact Assessment ("EIA"), regulatory applications under the Coal Conservation Act, Alberta Environmental Enhancement Act ("EPEA"), Water Act, and Public Lands Act.

Read Full Article

Coalspur Mines Limited (ASX:CPL) Additional Strategic Coal Leases Acquired in Hinton Region

🕔4/30/2012 9:31:00 AM 2300

Coalspur Mines Limited (ASX:CPL) (TSE:CPT) is pleased to announce the acquisition of 14,432 hectares of coal bearing leases ("Vista Extension") which are contiguous with the Company's Vista Coal Project ("Vista") for C$13 million in cash. Vista Extension is located on the northeast boundary of Vista and is in a land use area classified as category four which is the most favourable for resource development in Alberta. A portion of Vista Extension includes 5.1 million tonnes of surface mineable coal which was included in the Recoverable Coal Reserves estimated in the recently completed feasibility study on Vista.

Read Full Article

Coalspur Mines Limited (ASX:CPL) Study Increases Vista Production Capacity to 12.0 MTPA

🕔4/26/2012 9:29:00 AM 2150

Coalspur Mines Limited (ASX:CPL) (TSE:CPT) is pleased to announce that the annual marketable coal production capacity from the Vista Coal Project ("Vista") has increased by 7% to 12.0 million tonnes per annum ("Mtpa"). The increased production rate is the result of an optimization study on the coal processing plant ("CPP") and mine scheduling and follows a feasibility study on Vista which was published on January 30, 2012.

Read Full Article

Coalspur Mines Limited (ASX:CPL) Vista Project Update

🕔3/30/2012 9:48:00 AM 2458

Coalspur Mines Limited (ASX:CPL) (TSE:CPT) advises that following the successful release of the Feasibility Study relating to its Vista Coal Project ("Vista"), the Company has continued the process, commenced in December 2011, to identify potential strategic investment partners which may provide future funding for the development of Vista and coal marketing arrangements (the "Process").

Read Full Article

Coalspur Mines Limited (ASX:CPL) Increases Port Allocation at Ridley to 13.5MTPA

🕔3/29/2012 9:20:00 AM 2219

Coalspur Mines Limited (ASX:CPL) (TSE:CPT) is pleased to announce that it has reached a second agreement with Ridley Terminals Inc. ("Ridley Terminals") on terms for the shipment of export thermal coal from Coalspur's Vista Coal Project ("Vista") for an additional 5.0Mtpa. Subject to requisite Government approvals for the addition of a fourth stacker / reclaimer at Ridley Terminals, the second agreement provides for 4.0Mtpa to be supplied from an incremental expansion at Ridley Terminals that will increase capacity from 25.0Mtpa to 30.0Mtpa.

Read Full Article

Coalspur Mines Limited (ASX:CPL) Commences Detailed Design Engineering on Vista

🕔3/21/2012 1:27:00 PM 2181

Coalspur Mines Limited (ASX:CPL) (TSE:CPT) is pleased to announce that it has contracted CWA Engineering Inc. ("CWA") to commence detailed engineering on its flagship Vista Coal Project ("Vista"). CWA will be responsible for the engineering, procurement and construction management ("EPCM") and will engage sub-contractors to perform other specialized services.

Read Full Article

Coalspur Mines Limited (ASX:CPL) Coalspur Enters into C$70 Million Facility Agreement

🕔2/27/2012 8:25:00 AM 2153

Coalspur Mines Limited (ASX:CPL) (TSE:CPT) is pleased to announce that it has entered into a binding agreement with the Highland Park Group for a C$70 million loan facility ("Facility Agreement"). The purpose of the Facility Agreement is to provide the Company with substantial capital resources to commence detailed engineering on its flagship Vista Coal Project.

Read Full Article
###

210,868 COMPANY PROFILE VIEWS

  • This Page Viewed: (Last 7 Days: 481) (Last 30 Days: 1136) (Since Published: 84841) 

Company Data

    Headquarters
  • Suite 600, 543 Granville Street
    Vancouver, BC
    Calgary, Alberta, Canada
    V6C 1X8 CANADA
  • Telephone
  • +1-604-697-4470 
  • Principal Sector
  • Mining 
  • Principal Industry
  • Energy 
  • Listed
  • 1987/08/27 
  • Homepage
  • www.coalspur.com

Company Reports