Palm Valley 12 Drilling Update
Brisbane, Oct 11, 2022 AEST (ABN Newswire) - Central Petroleum Limited (ASX:CTP) (C9J:FRA) (CNPTF:OTCMKTS) advises that as at 0600 hrs ACST on 10 October 2022 the Palm Valley 12 (PV12) sidetrack (ST2) in OL3 was undergoing clean-up flows in preparation for a further flow test. The well reached a total depth of 3,039m measured depth on 8 October 2022.
After flow testing is complete, operations will commence to run production tubing and complete the well as a gas producer.
The PV12 ST2 well is being drilled under a joint venture between Central (50% interest), New Zealand Oil & Gas Limited (ASX:NZO) (35% interest) and Cue Energy Resources Limited (ASX:CUE) (15% interest).
About Central Petroleum Limited
Central Petroleum Limited (ASX:CTP) is an established ASX-listed Australian oil and gas producer (ASX:CTP) with exploration and appraisal permits in the Northern Territory (NT). Central has grown to become the largest onshore gas operator in the NT, supplying residential and industrial customers in the NT and wider Australian east coast market.
Central is seeking to become a major domestic energy supplier, in addition to helium and naturally occurring hydrogen, with exploration, appraisal and development plans across 169,112 km2 of tenements the NT, including some of Australia's largest known onshore conventional gas prospects in the Amadeus Basin.
| ||
|