Central Petroleum Limited

ASX:CTP ISIN:AU000000CTP7

Central Petroleum LimitedCentral Petroleum Limited (ASX:CTP) is an established ASX-listed Australian oil and gas producer (ASX:CTP) with exploration and appraisal permits in the Northern Territory (NT). Central has grown to become the largest onshore gas operator in the NT, supplying residential and industrial customers in the NT and wider Australian east coast market. 

Central is seeking to become a major domestic energy supplier, in addition to helium and naturally occurring hydrogen, with exploration, appraisal and development plans across 169,112 km2 of tenements the NT, including some of Australia's largest known onshore conventional gas prospects in the Amadeus Basin.

 
 
            

View in Other Languages

News

Central Petroleum Limited (ASX:CTP) Coal Bed Methane Drilling Report 120908

🕔9/12/2008 12:24:33 PM 1742

Central Petroleum Limited (ASX:CTP)(PINK:CPTLF) report that at 0600 this morning, DST #1 had tested coals over the interval 798.2 to 810.5 with very good preliminary indications of permeability (ability to flow). Further detail will be released as and when it is available.

Read Full Article

Central Petroleum Limited (ASX:CTP) Coal Bed Methane Drilling Report 110908

🕔9/11/2008 11:55:03 AM 1674

Central Petroleum Limited (ASX:CTP)(PINK:CPTLF) report that at 0600 this morning, after waiting on replacement parts for DST Australia DST equipment and Security DBS coring equipment it is anticipated that DST#1 will be completed today and that coring operations will re-commence.

Read Full Article

Central Petroleum Limited (ASX:CTP) Coal Bed Methane Drilling Report 100908

🕔9/10/2008 11:34:28 AM 1567

Central Petroleum Limited (ASX:CTP)(PINK:CPTLF) report that at 0600 this morning the well had reached a TD of 811m having drilled through approximately 7-9m of coal with good cleating and evidence of fracturing. Preparations are in hand to conduct a bottom hole drill stem test (BHT DST) on the coal intersection to measure permeability (ability to flow fluids). Elevated gas readings up to 8 units including C1 to C3 were recorded while drilling the coal, representing 4 times background gas of 2 units.

Read Full Article

Central Petroleum Limited (ASX:CTP) Coal Bed Methane Drilling Report 090908

🕔9/9/2008 12:56:36 PM 1663

Central Petroleum Limited (ASX:CTP)(PINK:CPTLF) report that at 0600 this morning following further delays in wireline coring acquisition, due to drilling contractor and service company operational matters, the well had reached a total depth (TD) of 795m in the Permian coal bearing Purni Formation.

Read Full Article

Central Petroleum Limited (ASX:CTP) Coal Bed Methane Drilling Report 080908

🕔9/8/2008 11:58:18 AM 1740

Central Petroleum Limited (ASX:CTP)(PINK:CPTLF) report that at 0600 this morning following some delays in wireline coring acquisition, due to a broken latchkey, the well had reached a total depth (TD) of 774m in the Permian coal bearing Purni Formation.

Read Full Article

Central Petroleum Limited (ASX:CTP) Coal Bed Methane Drilling Report 050908

🕔9/5/2008 9:06:50 PM 1720

Central Petroleum Limited (ASX:CTP)(PINK:CPTLF) report that at 0600 this morning drilling ahead in the Permian coal bearing Purni Formation was expected to commence by 0900 NT time. Overnight problems with the BOP stack had delayed the anticipated commencement of drilling. It is expected that the section will be drilled and drill stem tested over the next few days.

Read Full Article

Central Petroleum Limited (ASX:CTP) Coal Bed Methane Drilling Report 0430908

🕔9/4/2008 11:50:35 AM 1806

Central Petroleum Limited (ASX:CTP)(PINK:CPTLF) report that at 0600 this morning preparations were being made to run in to the hole to drill ahead in the Permian coal bearing Purni Formation. It is expected that the section will be drilled and drill stem tested over the next few days.

Read Full Article

Central Petroleum Limited (ASX:CTP) Coal Bed Methane Drilling Report 030908

🕔9/3/2008 1:50:50 PM 1589

Central Petroleum Limited (ASX:CTP)(PINK:CPTLF) report that at 0600 this morning preparations were being made to cement in place an intermediate string of 7" casing at 705m near to the top of the Permian coal bearing Purni Formation. Background gas of c.6 units (560 ppm) maximum including c1 to c4 gases have been recorded to date in overlying sediments.

Read Full Article

Central Petroleum Limited (ASX:CTP) Coal Bed Methane Drilling Report 020908

🕔9/2/2008 3:39:20 PM 1674

Central Petroleum Limited (ASX:CTP)(PINK:CPTLF) announce that at 0600 this morning the well had been drilled to 705m with preliminary wellsite interpretation putting the top of the Permian Purni target formation for Coal Bed Methane (CBM) evaluation at 696m.Preparations were being made to drill set an intermediate string of 7" casing at 705m.

Read Full Article

Central Petroleum Limited (ASX:CTP) Announce Drilling Report For Winton Formation

🕔9/1/2008 11:10:06 AM 1534

Central Petroleum Limited's (ASX:CTP)(PINK:CPTLF) Announce drilling report 010908 CBM93001. At 0600 this morning the well had been drilled to 280m in the Winton Formation and preparations were being made to drill ahead after setting 9 5/8" casing.

Read Full Article
###

570,403 COMPANY PROFILE VIEWS

  • This Page Viewed: (Last 7 Days: 993) (Last 30 Days: 5265) (Since Published: 329337) 

Company Data

    Headquarters
  • Level 7, 369 Ann St
    Brisbane, Queensland 4000
    Australia
  • Telephone
  • +61-7-3181-3800 
  • Fax
  • +61-7-3181-3855 
  • Principal Sector
  • Energy 
  • Principal Industry
  • Energy 
  • Homepage
  • www.centralpetroleum.com.au
  • E:
  • info@centralpetroleum.com.au

Company Reports