Central Petroleum Limited

ASX:CTP ISIN:AU000000CTP7

Central Petroleum LimitedCentral Petroleum Limited (ASX:CTP) is an established ASX-listed Australian oil and gas producer (ASX:CTP) with exploration and appraisal permits in the Northern Territory (NT). Central has grown to become the largest onshore gas operator in the NT, supplying residential and industrial customers in the NT and wider Australian east coast market. 

Central is seeking to become a major domestic energy supplier, in addition to helium and naturally occurring hydrogen, with exploration, appraisal and development plans across 169,112 km2 of tenements the NT, including some of Australia's largest known onshore conventional gas prospects in the Amadeus Basin.

 
 
            

View in Other Languages

News

Central Petroleum Limited (ASX:CTP) Coal Bed Methane Drilling Report 080908

🕔9/8/2008 11:58:18 AM 1412

Central Petroleum Limited (ASX:CTP)(PINK:CPTLF) report that at 0600 this morning following some delays in wireline coring acquisition, due to a broken latchkey, the well had reached a total depth (TD) of 774m in the Permian coal bearing Purni Formation.

Read Full Article

Central Petroleum Limited (ASX:CTP) Coal Bed Methane Drilling Report 050908

🕔9/5/2008 9:06:50 PM 1436

Central Petroleum Limited (ASX:CTP)(PINK:CPTLF) report that at 0600 this morning drilling ahead in the Permian coal bearing Purni Formation was expected to commence by 0900 NT time. Overnight problems with the BOP stack had delayed the anticipated commencement of drilling. It is expected that the section will be drilled and drill stem tested over the next few days.

Read Full Article

Central Petroleum Limited (ASX:CTP) Coal Bed Methane Drilling Report 0430908

🕔9/4/2008 11:50:35 AM 1453

Central Petroleum Limited (ASX:CTP)(PINK:CPTLF) report that at 0600 this morning preparations were being made to run in to the hole to drill ahead in the Permian coal bearing Purni Formation. It is expected that the section will be drilled and drill stem tested over the next few days.

Read Full Article

Central Petroleum Limited (ASX:CTP) Coal Bed Methane Drilling Report 030908

🕔9/3/2008 1:50:50 PM 1293

Central Petroleum Limited (ASX:CTP)(PINK:CPTLF) report that at 0600 this morning preparations were being made to cement in place an intermediate string of 7" casing at 705m near to the top of the Permian coal bearing Purni Formation. Background gas of c.6 units (560 ppm) maximum including c1 to c4 gases have been recorded to date in overlying sediments.

Read Full Article

Central Petroleum Limited (ASX:CTP) Coal Bed Methane Drilling Report 020908

🕔9/2/2008 3:39:20 PM 1361

Central Petroleum Limited (ASX:CTP)(PINK:CPTLF) announce that at 0600 this morning the well had been drilled to 705m with preliminary wellsite interpretation putting the top of the Permian Purni target formation for Coal Bed Methane (CBM) evaluation at 696m.Preparations were being made to drill set an intermediate string of 7" casing at 705m.

Read Full Article

Central Petroleum Limited (ASX:CTP) Announce Drilling Report For Winton Formation

🕔9/1/2008 11:10:06 AM 1248

Central Petroleum Limited's (ASX:CTP)(PINK:CPTLF) Announce drilling report 010908 CBM93001. At 0600 this morning the well had been drilled to 280m in the Winton Formation and preparations were being made to drill ahead after setting 9 5/8" casing.

Read Full Article

Central Petroleum Limited (ASX:CTP) Announce Updated Drilling Programme 2008

🕔8/26/2008 11:16:02 AM 1272

Central Petroleum Limited's (ASX:CTP)(PINK:CPTLF) CBM93001 Coal Bed Methane well is expected to spud on Wednesday 27th August. The well of approximately 1,200m Total Depth (TD) is expected to test a thick sequence of Permian coals updip from the Blamore 1 well recently plugged and abandoned due to engineering problems associated with hole sloughing and then failure of drill stem test tools to function.

Read Full Article

Central Petroleum Limited (ASX:CTP) Appoints Chief Financial Officer and Company Secretary

🕔8/15/2008 3:27:30 PM 1523

Central Petroleum Limited (ASX:CTP)(PINK:CPTLF) wishes to announce that effective 18 August 2008, Mr Bernard Crawford will be appointed as Chief Financial Officer and Company Secretary.

Read Full Article

Central Petroleum (ASX:CTP) Blamore 1 Pedirka Basin Drilling Progress Report

🕔8/14/2008 1:43:59 PM 1746

Blamore 1 is the first well in a planned 7 well programme in 2008 targeting prospective Undiscovered Oil/Gas Initially in Place (UOIIP/UGIIP) at "high" estimate of 260 Mmbbls oil and 4.6 TCFG gas and up to 180 BCFG Helium in conventional reservoirs as well as representing the first phase of exploration for 34-70 TCFG in prospective recoverable Coal Bed Methane resources.

Read Full Article

Central Petroleum Limited (ASX:CTP) Announce Blamore 1 Pedirka Basin Drilling Progress Report 110708

🕔7/11/2008 11:13:08 AM 1545

Central Petroleum Limited (ASX:CTP)(PINK:CPTLF) Announce that Blamore 1 is the first well in a planned 7 well programme in 2008 targeting prospective recoverable resources at "high" estimate of 260 Mmbbls oil and 2.4 TCFG gas and up to 105 BCFG Helium in conventional reservoirs as well as representing the first phase of exploration for 34-70 TCFG in prospective recoverable Coal Bed Methane resources.

Read Full Article
###

461,830 COMPANY PROFILE VIEWS

  • This Page Viewed: (Last 7 Days: 1663) (Last 30 Days: 5068) (Since Published: 267159) 

Company Data

    Headquarters
  • Level 7, 369 Ann St
    Brisbane, Queensland 4000
    Australia
  • Telephone
  • +61-7-3181-3800 
  • Fax
  • +61-7-3181-3855 
  • Principal Sector
  • Energy 
  • Principal Industry
  • Energy 
  • Homepage
  • www.centralpetroleum.com.au
  • E:
  • info@centralpetroleum.com.au