Central Petroleum Limited (
Operations over the last week included placing cement plugs in the build section and installing and cementing the 7" liner in place. The tie-back assembly including the downhole deployment valve was installed to enable the air drilling of the lateral sidetrack. The rig is expected to commence air-drilling the lateral in the P2/P3 formations within the next 24 hours. Depending on the rate of penetration, the P2/P3 lateral is anticipated to be completed within the next 3 weeks.
The objective of the sidetrack is to test the vertically fractured lower P2 sandstone, encountered in the original well, from a horizontal well bore for approximately 450mMD before entering the P3 sandstone and drilling approximately 450mMD at a near horizontal angle.
The PV12 ST1 well is being drilled under a joint venture between Central (50% interest), New Zealand Oil & Gas Limited (
About Central Petroleum Limited
Central Petroleum Limited (Central) is an established ASX-listed Australian oil and gas producer (ASX:CTP) with exploration and appraisal permits in the Northern Territory (NT). Central has grown to become the largest onshore gas operator in the NT, supplying residential and industrial customers in the NT and wider Australian east coast market.
Central is seeking to become a major domestic energy supplier, in addition to helium and naturally occurring hydrogen, with exploration, appraisal and development plans across 169,112 km2 of tenements the NT, including some of Australia's largest known onshore conventional gas prospects in the Amadeus Basin.
Contact
Investor and Media Inquiries:Greg Bourke: +61-478-318-702
Sarah Morgan: +61-421-664-969
Related Companies
Related Industry Topics: